Skip to main content

Cross Link

Large industrial finishing booth in a Crosslink-supplied facility photograph
INDUSTRIAL CAPACITY / DFW, TEXAS 01 — 02

BUILT FOR WHAT
MUST SUCCEED.

Industrial-scale powder coating for the infrastructure the world depends on.

Large components. Demanding specifications. Real deadlines. Powered by more than 35 years of Crosslink experience.

FORT WORTH + SEAGOVILLEENGINEERED TO GO FURTHER
CRITICAL INFRASTRUCTUREDATA CENTERS + AIENERGY + ELECTRICALLARGE-SCALE INDUSTRIAL
75,000 SQ FTSEAGOVILLE FACILITY
16′ × 14′ × 48′SPRAY BOOTHS · W × H × L
48 FTSEAGOVILLE OVEN LENGTH
35+ YEARSCROSSLINK EXPERIENCE

WHEN SUCCESS IS THE ONLY OPTION,
THE FINISH MATTERS.

Corrosion. Downtime. A missed delivery. The consequences go beyond the component.

We prepare and coat the large fabricated parts behind essential infrastructure—where durability, coating requirements and production schedules carry real weight.

02 / INDUSTRIES WE SERVE

CRITICAL TO YOU.
MISSION CRITICAL TO US.

Built for the systems that keep business moving, power flowing and people connected.

01Data centers & AI

Server infrastructure, electrical distribution, generator and UPS components, cooling equipment and structural assemblies for rapid deployment.

SERVER RACKS / COOLING / SUPPORT STEEL
02Power & electrical

Durable finishes for switchgear, transformer housings, substations, electrical enclosures and utility equipment.

SWITCHGEAR / ENCLOSURES / UTILITY EQUIPMENT
03Energy

Surface preparation and coatings for power generation, renewable-energy equipment and oil and gas infrastructure.

POWER GENERATION / EQUIPMENT FRAMES
04Structural steel

Large-format finishing for beams, fabricated assemblies and support steel, coordinated around your dimensions and production requirements.

BEAMS / ASSEMBLIES / FABRICATED STEEL
05Telecommunications

Protective finishes for network infrastructure, tower components and equipment cabinets exposed to demanding environments.

TOWER COMPONENTS / NETWORK CABINETS
06Industrial manufacturing

Coating and surface preparation for machinery, equipment frames and components where downtime affects production.

MACHINERY / OEM PARTS / EQUIPMENT
07Transportation & infrastructure

Finishing for structural components and equipment supporting rail, airports and transportation systems.

RAIL / AIRPORTS / TRAFFIC SYSTEMS
08Healthcare

Durable finishes for hospital infrastructure, equipment housings and support components.

INFRASTRUCTURE / HOUSINGS / SUPPORTS
09Aerospace & defense

Discuss surface preparation and coating requirements for specification-sensitive equipment and high-reliability components.

EQUIPMENT / FABRICATED COMPONENTS
Server racks illustrating data center infrastructure
APPLICATION FOCUS

DATA CENTERS & AI

Server infrastructure, electrical distribution, generator and UPS components, cooling equipment and structural assemblies for rapid deployment.

SERVER RACKS / COOLING / SUPPORT STEEL
Industry illustration

03 / LARGE-FORMAT CAPABILITY

BIG ISN’T A CHALLENGE.
IT’S WHAT WE’RE BUILT FOR.

75,000 SF

Seagoville, Texas

SEAGOVILLE / EQUIPMENT ENVELOPEW × H × L
Spray booth: 16 feet wide, 14 feet high, 48 feet long16′ WIDTH14′ HEIGHT48′ LENGTH
DRAG TO ROTATE · ← → KEYS
02 × INDUSTRIAL SPRAY BOOTHSPROPORTIONAL EQUIPMENT ENVELOPE

EXPLORE THE CAPACITY

4Blast pods
50′ × 50′Blast facility
27′Wash System

Equipment dimensions shown. Send drawings for a review of part fit, handling and process requirements.

04 / TWO DFW OPERATIONS

TWO FACILITIES.
ONE STANDARD.

Established experience in Fort Worth.
Expanded industrial capacity in Seagoville.

Panoramic view of the Crosslink powder coating facility
CROSSLINK POWDER COATING FACILITY / DFW, TEXAS
01 / FORT WORTH

40,000 SF

more than 35 years of industrial finishing experience.

  • 6 oven slots · maximum 10′ W × 12′ H × 54′ L
  • Blasting for components up to 54 feet long
  • 96-inch tabletop Wheelabrator
  • 2 sandblasting pods · ~1,000 sq ft blast area
  • 40′ long Wash System
  • Powder coating, ceramic coating, pickup & delivery
02 / SEAGOVILLENEW LARGE-SCALE OPERATION

75,000 SF

More space for oversized industrial work.

  • 2 curing ovens · 12′ W × 14′ H × 48′ L
  • 2 spray booths · 16′ W × 14′ H × 48′ L
  • 4 blast pods · 50′ × 50′ blast facility
  • 27′ Wash System
  • Capacity for large fabricated components and volume
  • Pickup & delivery available

05 / THE PROCESS

FROM SURFACE PREP
TO FINAL FINISH.

Every stage supports the next. A durable finish starts before the powder is applied.

  1. 01

    Receive / prep

    Review dimensions, coating requirements and handling.

  2. 02

    Blast

    Sandblasting and shot blasting prepare the surface.

  3. 03

    Wash / pre-treat

    Clean and prepare for the specified coating process.

  4. 04

    Powder

    Apply powder to prepared components.

  5. 05

    Cure

    Cure the applied finish in batch ovens.

  6. 06

    Inspect

    Review the finished work against project requirements.

  7. 07

    Deliver

    Coordinate pickup and delivery around your schedule.

POWDER COATINGSANDBLASTINGSHOT BLASTINGCERAMIC COATINGPICKUP & DELIVERY

06 / CONNECTED PROJECT VISIBILITY

FROM QUOTE TO COMPLETION.
STAY CONNECTED.

Our ERP system drives the work behind the scenes. The customer portal gives you one place to follow the details that keep your project moving.

01Quotes & purchase orders
02Part status & progress
03Shipping & invoices
Open customer portal
CUSTOMER PORTAL PROJECT VISIBILITY
ACTIVE WORK ORDERYOUR PROJECT, IN VIEW.
72%
  1. 01ReceivedOrder confirmed
  2. 02Surface prepPreparation complete
  3. 03CoatingCurrent stage
  4. 04Quality checkUp next
  5. 05ReadyShipping & invoice
QUOTESReview details
PARTSTrack progress
SHIPPINGPlan delivery
ERP-DRIVEN OPERATIONSSECURE CUSTOMER ACCESS ↗

07 / THE CROSSLINK FOUNDATION

BIG PARTS.
TIGHT SPECS.
REAL DEADLINES.

A new scale of capability.
More than 35 years of getting it done.

Mission Critical brings Crosslink’s established finishing experience to the next generation of infrastructure. We work with fabricators, OEMs, contractors and project teams to align surface preparation, coating and delivery with the job.

Room for the real project.

Large-format equipment and two DFW operations support oversized parts and production work.

Preparation with a purpose.

Sandblasting, shot blasting and washing support a consistent, durable finish.

A plan for the last mile.

Crosslink’s three delivery trucks handle varied loads, including single pieces up to approximately 26 feet.

08 / CROSSLINK PROJECT WORK

THE FINISH SPEAKS
FOR ITSELF.

Large industrial AI infrastructure unit being finished inside the coating booth

09 / THE NEXT WAVE OF INFRASTRUCTURE

FINISHING THE
NEXT GENERATION
OF INFRASTRUCTURE.

From support steel and equipment frames to electrical enclosures, cooling infrastructure and generator / UPS components, large-scale deployment needs large-scale finishing.

The same capacity serves energy, electrical, industrial and infrastructure projects across the region.

Discuss your infrastructure project

10 / PROVEN THROUGH CROSSLINK

★★★★★

Amazing Experience

“Crosslink does quality work and has outstanding customer service, I highly recommend them!”

Mike Sumner / S&S Fabrication

YOUR NEXT PROJECT STARTS HERE

LET’S COAT
WHAT’S NEXT.

Send your dimensions, quantities and coating requirements.

Our team can help determine the right process and production approach.